Roseville Department of Motor Vehicles

Roseville, California
  • New single-story wood framed building
  • LEED silver certification
  • 16,000 square feet
  • Approximately $5,000,000 construction cost

Incline Village Hospital

Incline Village, Nevada
  • Seismic retrofit of existing building determined to be a collapse hazard
  • Addition of two steel braced frames and tie discontinuous diaphragms together
  • Reinforcement of building collectors for lateral force resisting system

U.C. Davis Medical Center MIND Institute

Sacramento, California
  • Five steel braced frame buildings for Medical Research/Lab occupancy
  • Two-story clinic, three-story dry lab, two-story wet lab, two-story resource building
  • 140,400 square feet
  • Approximately $45,000,000 construction cost

Independent Living Center

Yuba City, California
  • Three-story, 92,000 SF Living Center
  • Single-story, 2,000 SF Central Plant
  • Single-story, 3,000 SF Pavilion/Gym
  • Plywood shearwall and steel moment frame buildings
  • Approximately $20,000,000 construction cost

DDJC Army Depot General Warehouse

Tracy, California
  • New 480,000 square foot concrete tilt-up
  • Integrated project delivery utilized with early collaboration with sub-consultants
  • Fast-Track delivery was utilized with incremental approvals in order to expedite construction on critical path elements
  • Approximately $30,000,000 construction cost

Black Box Theater

Tracy, California
  • New two-story wood framed theater
  • 3D BIM with Revit
  • 7,800 square feet
  • Approximately $3,000,000 construction cost

Dillard Elementary School

Wilton, California
  • New elementary school campus
  • Two-story moment frame classroom wings
  • Single-story curved steel plate shear walls at administrative and multi-purpose buildings
  • 3D BIM with Revit
  • 76,000 square feet
  • Approximately $22,000,000 construction cost

Tahoe Forest Hospital

Truckee, California
  • Two-story, steel braced frame Western Addition hospital
  • Two-story, steel braced frame Cancer Center
  • Single-story steel braced frame ER expansion
  • Two-story steel braced frame Birthing Center
  • Single-story wood framed SNF expansion
  • Expansion to the existing Central Energy Plant Approximately $93,500,000 construction cost